► Predl Systems – 16/Nov/2017 – South Verano Sewer Project
► Predl Systems – 08/Nov/2017 – PVC to HDPE Transition Strip
► Predl Systems – 17/Oct/2017 – Water Recovery Facility – Fort St. John, BC
► Predl Systems – 11/Oct/2017 – “Rocket” Trade Show Sample
► Predl Systems – 03/Oct/2017 – Twin Falls Idaho
► Predl Systems – 30/Aug/2017 – Beech Street – Yakima, WA
► Predl Systems – 22/Aug/2017 – Manatee County Cone Top
► Predl Systems – 15/Aug/2017 – Alaska Highway – Fort St. John
► Predl Systems – 04/Aug/2017 – Manchester Pump Station
► Predl Systems – 28/Jul/2017 – Bend SE Interceptor – Phase 2
► Predl Systems – 14/Jul/2017 – Wilderness Hills Sewer
► Predl Systems – 07/Jul/2017 – ISO 14001 Certified
► Predl Systems – 30/Jun/2017 – Cascade Dr / Hanover Twp., PA
► Predl Systems – 21/Jun/2017 – Blackwash Augmentation – Field Welding – Tucson, AZ
► Predl Systems – 14/Jun/2017 – Blackwash Augmentation – Manufacturing – Tucson, AZ
► Predl Systems – 31/May/2017 – Installation + Thermoplastic Field Welding – Tucson, AZ
► Predl Systems – 18/May/2017 – Control Station – City of Williams Lake, BC
► Predl Systems – 10/May/2017 – Triple Containment 1500mm Precast MH – Port Coquitlam, BC
► Predl Systems – 04/April/2017 – 72” ID Wetwell Rehab – City of Redmond
► Predl Systems – 31/March/2017 – 72” ID Wetwell Rehab [Onsite Installation] – City of Redmond
► Predl Systems – 23/March/2017 – 72” Baseliner w/ 32” Slide Gates – Bend, OR
► Predl Systems – 16/March/2017 – Cast-In-Place Capabilities
► Predl Systems – 10/March/2017 – American Veranda Gardens Phase 3 – Port St Lucie, FL
► Predl Systems – 27/February/2017 – Forcemain Discharge MH – Tillamook, OR
► Predl Systems – 22/February/2017 – NPCA 2017 – Cleveland, Ohio
► Predl Systems – 16/February/2017 – 48” MH Replacement for Cameron, TX
► Predl Systems – 03/February/2017 – 72” ID Wetwell Rehab [In Progress] – City of Redmond
► Predl Systems – 24/January/2017 – 96″ SSMH Junction Structure – City of Healdsburg
► Predl Systems – 19/January/2017 – 96″ Diameter Wetwell – Tangerine Ridge
► Predl Systems – 20/December/2016 – Happy Holidays!
► Predl Systems – 15/December/2016 – 60″ and 72″ Fully Lined MH – City of Healdsburg
► Predl Systems – 07/December/2016 – Audie Murphy Ranch – Fully Lined MH – City of Menifee
► Predl Systems – 30/November/2016 – City of Fond Du Lac – Phase II & III: Precast & Installation
► Predl Systems – 23/November/2016 – Happy Thanksgiving 2016
► Predl Systems – 17/November/2016 – Fully Lined Forcemain Discharge MH – EMWD – Installation
► Predl Systems – 10/November/2016 – Tompkins St. – City of Fond Du Lac – WI – Phase I: Fabrication
► Predl Systems – 27/October/2016 – Thank you APEGBC 2016 – Victoria, BC
► Predl Systems – 20/October/2016 – Murrieta – EMWD – Manhole Construction
► Predl Systems – 13/October/2016 – Advance Precast – FULLY LINED MANHOLE
► Predl Systems – 06/October/2016 – WET WELL REHAB 2 – Battle Mountain – Phase I: Fabrication
► Predl Systems – 29/September/2016 – Thank you WEFTEC 2016 – New Orleans, LA
► Predl Systems – 22/September/2016 – WEFTEC 2016 – New Orleans, LA
► Predl Systems – 01/September/2016 – 120” Monolithic Burrard Chamber MH – Phase III: Installation
► Predl Systems – 25/August/2016 – 120” Monolithic Burrard Chamber MH – Phase II: Precast Concrete
► Predl Systems – 18/August/2016 – 120” Monolithic Burrard Chamber MH – Phase I: Fabrication
► Predl Systems – 21/July/2016 – Pierce County Presentation
► Predl Systems – 14/July/2016 – Valhalla Sewer Relocation – Bend, OR
► Predl Systems – 07/July/2016 – 84” Sanitary Manhole – Renton, WA
► Predl Systems – 30/June/2016 – Happy 4th of July
► Predl Systems – 23/June/2016 – Marinwood 72″ Channelized MH
► Predl Systems – 16/June/2016 – ISO 9001:2015
► Predl Systems – 09/June/2016 – Lower Sycolin Sewage Project – Leesburg,VA
► Predl Systems – 19/May/2016 – Control Station – City of Williams Lake
► Predl Systems – 12/May/2016 – Boundary Pump Station Upgrade
► Predl Systems – 05/May/2016 – Thank You!
► Predl Systems – 28/April/2016 – SMH13 – Field Welding
► Predl Systems – 21/April/2016 – Atlantic TNG – Sarasota, FL
► Predl Systems – 14/April/2016 – Upcoming Exhibitions
► Predl Systems – 07/April/2016 – ETCH Sanitary Upgrade
► Predl Systems – 24/March/2016 – 96” Diameter Wet Well
► Predl Systems – 17/March/2016 – Advanced Confined Safety
► Predl Systems – 10/March/2016 – Gasketed Slide Gates
► Predl Systems – 03/March/2016 – A-Lok Premium Gasket Project
► Predl Systems – 25/February/2016 – Manhole Rehabilitation
► Predl Systems – 18/February/2016 – Live Flow Manhole Rehab
► Predl Systems – 11/February/2016 – Thurston Street – SMH#13 – CorProtect Lined Flat Top Slab
► Predl Systems – 04/February/2016 – Thurston Street – SMH#13 – Baseliner
► Predl Systems – 28/January/2016 – Predl Rehabilitation
► Predl Systems – 21/January/2016 – Predl CorProtect
► Predl Systems – 14/January/2016 – 48 Inch Standard Manhole
► Predl Systems – 07/January/2016 – Pipe Connections
► Predl Systems – 17/December/2015 – Why PREDL Concrete Protective Liners
► Predl Systems – 10/December/2015 – 120 Wet Well
► Predl Systems – 3/December/2015 – Technical Services
► Predl Systems – 12/November/2015 – 1st Lined MH Project with Oldcastle – Wilsonville,OR
► Predl Systems – 05/November/2015 – Thank You – PNCWA 2015
► Predl Systems – 29/October/2015 – 96 Inch Diameter Manhole
► Predl Systems – 22/October/2015 – Pump Station
► Predl Systems – 8/October/2015 – Wet Well Rehab Battle Mountain, NV
► Predl Systems – 1/October/2015 – Thank You – WEFTEC 2015
► Predl Systems – 23/September/2015 – WEFTEC 2015
► Predl Systems – 16/September/2015 – Live Flow Manhole Rehabilitation Projects
► Predl Systems – 2/September/2015 – Predl Baseliners Solve Low Flow Issues
► Predl Systems – 27/August/2015 – Predl Baseliner Preserve Groundwater
► Predl Systems – 19/August/2015 – Advanced Manhole Safety Features
► Predl Systems – 12/August/2015 – Large Bifurcate Lined Boxes
► Predl Systems – 16/July/2015 – Salina Municipal Solid Waste Landfill, Kansas
► Predl Systems – 08/July/2015 – Precast Baseliner Connection to FRP Manhole
► Predl Systems – 24/June/2015 – Precast Acid Tank Liner – Precast Concrete Stage
► Predl Systems – 18/June/2015 – Precast Acid Tank Liner – In Progress
► Predl Systems – 9/June/2015 – Wet Well Installation – In Progress
► Predl Systems – 3/June/2015 – Wet Well Installation – Field Welding
► Predl Systems – 28/May/2015 – Phase 2 Accepted Value Engineering Proposal – RP
► Predl Systems – 21/May/2015 – Predl Systems – Telescopic Access Collar
► Predl Systems – 14/May/2015 – Predl Systems – Wet Well Installation
► Predl Systems – 6/May/2015 – Unlined Monolithic Inverts
► Predl Systems – 29/April/2015 – Discovery Corridor CARV Vault Update
► Predl Systems – 22/April/2015 – Thank You Texas Water 2015
► Predl Systems – 16/April/2015 – Transition Structure Update – Field Welding
► Predl Systems – 13/April/2015 – WEF Collection Systems 2015 – Cinicinnati Ohio
► Predl Systems – 9/April/2015 – Grease Interceptor – Precast Tank
► Predl Systems – 2/April/2015 – Base Rehab Procedures
► Predl Systems – 25/March/2015 – Rehab Procedures
► Predl Systems – 18/March/2015 – 96 Inches Lift Station
► Predl Systems – 12/March/2015 – Thank You NPCA 2015