Weekly Newsletters

►  Predl Systems – 16/Nov/2017 – South Verano Sewer Project 

►  Predl Systems – 08/Nov/2017 – PVC to HDPE Transition Strip 

►  Predl Systems – 17/Oct/2017 – Water Recovery Facility – Fort St. John, BC 

►  Predl Systems – 11/Oct/2017 – “Rocket” Trade Show Sample 

►  Predl Systems – 03/Oct/2017 – Twin Falls Idaho 

►  Predl Systems – 30/Aug/2017 – Beech Street – Yakima, WA 

►  Predl Systems – 22/Aug/2017 – Manatee County Cone Top

►  Predl Systems – 15/Aug/2017 – Alaska Highway – Fort St. John
 

►  Predl Systems – 04/Aug/2017 – Manchester Pump Station 

►  Predl Systems – 28/Jul/2017 – Bend SE Interceptor – Phase 2
 

►  Predl Systems – 14/Jul/2017 – Wilderness Hills Sewer 

►  Predl Systems – 07/Jul/2017 – ISO 14001 Certified 

►  Predl Systems – 30/Jun/2017 – Cascade Dr / Hanover Twp., PA  

►  Predl Systems – 21/Jun/2017 – Blackwash Augmentation – Field Welding – Tucson, AZ  

►  Predl Systems – 14/Jun/2017 – Blackwash Augmentation – Manufacturing –  Tucson, AZ
   

►  Predl Systems – 31/May/2017 – Installation + Thermoplastic Field Welding – Tucson, AZ   

►  Predl Systems – 18/May/2017 – Control Station – City of Williams Lake, BC   

►  Predl Systems – 10/May/2017 – Triple Containment 1500mm Precast MH – Port Coquitlam, BC

►  Predl Systems – 04/April/2017 – 72” ID Wetwell Rehab – City of Redmond

►  Predl Systems – 31/March/2017 – 72” ID Wetwell Rehab [Onsite Installation] – City of Redmond

►  Predl Systems – 23/March/2017 – 72” Baseliner w/ 32” Slide Gates – Bend, OR

►  Predl Systems – 16/March/2017 – Cast-In-Place Capabilities 

►  Predl Systems – 10/March/2017 – American Veranda Gardens Phase 3  – Port St Lucie, FL

► Predl Systems – 27/February/2017 – Forcemain Discharge MH  – Tillamook, OR

► Predl Systems – 22/February/2017 – NPCA 2017 – Cleveland, Ohio

► Predl Systems – 16/February/2017 – 48” MH Replacement for Cameron, TX

► Predl Systems – 09/February/2017 – 96” Baseliner w/ 42” SDR35 (ASTM D3034) Compression Gasket Connections

► Predl Systems – 03/February/2017 – 72” ID Wetwell Rehab [In Progress] – City of Redmond

► Predl Systems – 24/January/2017 – 96″ SSMH Junction Structure – City of Healdsburg

► Predl Systems – 19/January/2017 – 96″ Diameter Wetwell – Tangerine Ridge

► Predl Systems – 20/December/2016 – Happy Holidays!

► Predl Systems – 15/December/2016 – 60″ and 72″ Fully Lined MH – City of Healdsburg

► Predl Systems – 07/December/2016 – Audie Murphy Ranch – Fully Lined MH – City of Menifee

► Predl Systems – 30/November/2016 – City of Fond Du Lac – Phase II & III: Precast & Installation

► Predl Systems – 23/November/2016 – Happy Thanksgiving 2016

► Predl Systems – 17/November/2016 – Fully Lined Forcemain Discharge MH – EMWD – Installation

► Predl Systems – 10/November/2016 – Tompkins St. – City of Fond Du Lac – WI – Phase I: Fabrication

► Predl Systems – 27/October/2016 – Thank you APEGBC 2016 – Victoria, BC

► Predl Systems – 20/October/2016 – Murrieta – EMWD – Manhole Construction

► Predl Systems – 13/October/2016 – Advance Precast – FULLY LINED MANHOLE

► Predl Systems – 06/October/2016 – WET WELL REHAB 2 – Battle Mountain – Phase I: Fabrication

► Predl Systems – 29/September/2016 – Thank you WEFTEC 2016 – New Orleans, LA

► Predl Systems – 22/September/2016 – WEFTEC 2016 – New Orleans, LA

► Predl Systems – 01/September/2016 – 120” Monolithic Burrard Chamber MH – Phase III: Installation

► Predl Systems – 25/August/2016 – 120” Monolithic Burrard Chamber MH – Phase II: Precast Concrete

► Predl Systems – 18/August/2016 – 120” Monolithic Burrard Chamber MH – Phase I: Fabrication

► Predl Systems – 21/July/2016 – Pierce County Presentation

► Predl Systems – 14/July/2016 – Valhalla Sewer Relocation – Bend, OR

► Predl Systems – 07/July/2016 – 84” Sanitary Manhole – Renton, WA

► Predl Systems – 30/June/2016 – Happy 4th of July

► Predl Systems – 23/June/2016 – Marinwood 72″ Channelized MH

► Predl Systems – 16/June/2016 – ISO 9001:2015

► Predl Systems – 09/June/2016 – Lower Sycolin Sewage Project – Leesburg,VA

► Predl Systems – 19/May/2016 – Control Station – City of Williams Lake

► Predl Systems – 12/May/2016 – Boundary Pump Station Upgrade

► Predl Systems – 05/May/2016 – Thank You!

► Predl Systems – 28/April/2016 – SMH13 – Field Welding

► Predl Systems – 21/April/2016 – Atlantic TNG – Sarasota, FL

► Predl Systems – 14/April/2016 – Upcoming Exhibitions

► Predl Systems – 07/April/2016 – ETCH Sanitary Upgrade

► Predl Systems – 24/March/2016 – 96” Diameter Wet Well

► Predl Systems – 17/March/2016 – Advanced Confined Safety

► Predl Systems – 10/March/2016 – Gasketed Slide Gates

► Predl Systems – 03/March/2016 – A-Lok Premium Gasket Project

► Predl Systems – 25/February/2016 – Manhole Rehabilitation

► Predl Systems – 18/February/2016 – Live Flow Manhole Rehab

► Predl Systems – 11/February/2016 – Thurston Street – SMH#13 – CorProtect Lined Flat Top Slab

► Predl Systems – 04/February/2016 – Thurston Street – SMH#13 – Baseliner

► Predl Systems – 28/January/2016 – Predl Rehabilitation

► Predl Systems – 21/January/2016 – Predl CorProtect

► Predl Systems – 14/January/2016 – 48 Inch Standard Manhole

► Predl Systems – 07/January/2016 – Pipe Connections

► Predl Systems – 17/December/2015 – Why PREDL Concrete Protective Liners

► Predl Systems – 10/December/2015 – 120 Wet Well

► Predl Systems – 3/December/2015 – Technical Services

► Predl Systems – 12/November/2015 – 1st Lined MH Project with Oldcastle – Wilsonville,OR

► Predl Systems – 05/November/2015 – Thank You – PNCWA 2015

► Predl Systems – 29/October/2015 – 96 Inch Diameter Manhole

► Predl Systems – 22/October/2015 – Pump Station

► Predl Systems – 8/October/2015 – Wet Well Rehab Battle Mountain, NV

► Predl Systems – 1/October/2015 – Thank You – WEFTEC 2015

► Predl Systems – 23/September/2015 – WEFTEC 2015

► Predl Systems – 16/September/2015 – Live Flow Manhole Rehabilitation Projects

► Predl Systems – 2/September/2015 – Predl Baseliners Solve Low Flow Issues

► Predl Systems – 27/August/2015 – Predl Baseliner Preserve Groundwater

► Predl Systems – 19/August/2015 – Advanced Manhole Safety Features

► Predl Systems – 12/August/2015 – Large Bifurcate Lined Boxes

► Predl Systems – 16/July/2015 – Salina Municipal Solid Waste Landfill, Kansas

► Predl Systems – 08/July/2015 – Precast Baseliner Connection to FRP Manhole

► Predl Systems – 24/June/2015 – Precast Acid Tank Liner – Precast Concrete Stage

► Predl Systems – 18/June/2015 – Precast Acid Tank Liner – In Progress

► Predl Systems – 9/June/2015 – Wet Well Installation – In Progress

► Predl Systems – 3/June/2015 – Wet Well Installation – Field Welding

► Predl Systems – 28/May/2015 – Phase 2 Accepted Value Engineering Proposal – RP

► Predl Systems – 21/May/2015 – Predl Systems – Telescopic Access Collar

► Predl Systems – 14/May/2015 – Predl Systems – Wet Well Installation

► Predl Systems – 6/May/2015 – Unlined Monolithic Inverts

► Predl Systems – 29/April/2015 – Discovery Corridor CARV Vault Update

► Predl Systems – 22/April/2015 – Thank You Texas Water 2015

► Predl Systems – 16/April/2015 – Transition Structure Update – Field Welding

► Predl Systems – 13/April/2015 – WEF Collection Systems 2015 – Cinicinnati Ohio

► Predl Systems – 9/April/2015 – Grease Interceptor – Precast Tank

► Predl Systems – 2/April/2015 – Base Rehab Procedures

► Predl Systems – 25/March/2015 – Rehab Procedures

► Predl Systems – 18/March/2015 – 96 Inches Lift Station

► Predl Systems – 12/March/2015 – Thank You NPCA 2015

► Predl Systems – 07/January/2015 – Inside Drop

► Predl Systems – 17/December/2014 – Ladder Rungs